City of Ledyard CT header
File #: 24-1072    Version: 1 Name:
Type: General Discussion Status: Agenda Ready
File created: 11/20/2024 In control: Water Pollution Control Authority
On agenda: 11/26/2024 Final action:
Title: Cashman Blasting Impact study on 16-inch water main on Route 12 continued.
Attachments: 1. EX#92 24-8SUP24-9SITE EmailHeller RfrlLedWPCA 092524, 2. EX#83-2 24-8SUP24-9CAM Dr.AimoneMartin AnalysisBlastingUtilities Rec092524
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

AGENDA REQUEST

GENERAL DISCUSSION ITEM

 

Subject:

title

Cashman Blasting Impact study on 16-inch water main on Route 12 continued.

end

 

 

Background:

From the October 22, 2024, meeting:

Mr. Capon recused from this item since he is the Chairman of the Planning and Zoning Commission.

 

The impact study has been reviewed by Groton Utilities. Although it is technically sound and no major impacts have been found, both GU and the WPCA want leak tests performed. There will be an initial test, a pre-blast test (which is a small amount of dynamite), and a post-blast test. The leak test request will be conveyed to Liz Burdick, Planning Director.

 

Mr. Duarte suggested having a meter pit installed, which would be beneficial to Cashman as well. He added a suggestion that Cashman is asked to either pay the entire amount or at least half of the amount. Mr. Duarte will give Chairman Lynch the full quote for the meter pit.

 

Department Comment/Recommendation: