AGENDA REQUEST

GENERAL DISCUSSION ITEM

 

Subject:

title

Review of Trail/Sewer line bids continued.

end

 

 

Background:

From the March 26, 2024, meeting:

After meeting with the Finance Committee on the water budget, Steve Masalin, Public Works Director and Steve Banks, WPCA Supervisor talked about the sewer line extension from the High School to Pennywise Lane (5-inch PVS line). Mr. Masalin stated that he needed to repave Gallup Hill Road which then afforded the opportunity to place the sewer line on top of the existing 2 ½" line and thus save on both construction and design engineering costs. Chairman Lynch, Mr. Banks and Mr. Masalin met with Mathew Jermine, of Weston and Sampson who agreed that such an approach would save a considerable amount of cost, even when considering the repaving cost of the road. Mr. Jermine stated that he would re-submit the proposal for the new approach. The Commissioners wanted to also look at two additional options; the extension of the sewer line up Route 117 (to Route 214) and up Fairway drive. Chairman Lynch will communicate these two additional options for consideration to Weston and Sampson.

After meeting with the Finance Committee on the water budget, Steve Masalin, Public Works Director and Steve Banks, WPCA Supervisor talked about the sewer line extension from the High School to Pennywise Lane (5-inch PVS line). Mr. Masalin stated that he needed to repave Gallup Hill Road which then afforded the opportunity to place the sewer line on top of the

After meeting with the Finance Committee on the water budget, Steve Masalin, Public Works Director and Steve Banks, WPCA Supervisor talked about the sewer line extension from the High School to Pennywise Lane (5-inch PVS line). Mr. Masalin stated that he needed to repave Gallup Hill Road which then afforded the opportunity to place the sewer line on top of the

 

 

 

Department Comment/Recommendation:

(type text here)