741 Colonel Ledyard Highway  
Ledyard, Connecticut 06339  
TOWN OF LEDYARD  
Economic Development Commission  
Meeting Minutes - Draft Minutes  
Chairman  
John Vincent  
Tuesday, July 2, 2024  
6:00 PM  
Town Hall Annex - Hybrid Format  
REMOTE MEETING INFORMATION  
Join Zoom Meeting  
Meeting ID: 851 6282 5350  
Passcode: 688919  
Dial by your location • +1 646 558 8656 US (New York)  
I.  
CALL TO ORDER  
Chairman Vincent called the meeting to order at 6:10 p.m. in the Conference Room of the Town  
Hall Annex Building. Chairman Vincent welcomed all to the Hybrid Meeting.  
II.  
ROLL CALL  
Commissioner Carol Ann Schneider  
Commissioner Michael Dreimiller  
Chairman John Vincent  
Present  
Commissioner Peter Hary  
Commissioner Richard Tashea  
Absent  
In addition, the following were present:  
Mayor Fred B. Allyn III.  
Liz Burdick, Director of Land Use & Planning  
III.  
APPROVAL OF MINUTES  
MOTION to Approve the Economic Development Commission regular meeting minutes April 2,  
2024  
APPROVED AND SO DECLARED  
Carol Ann Schneider  
RESULT:  
MOVER:  
Michael Dreimiller  
SECONDER:  
4
1
Schneider Dreimiller Vincent Hary  
Tashea  
AYE  
ABSENT  
IV.  
V.  
APPROVAL OF AGENDA  
No changes.  
CITIZENS COMMENTS  
None.  
VI.  
A.  
REPORTS  
Mayor’s Report  
The sewer line extension project is progressing nicely. It is stubbed at the south side of the  
driveway of the Ledyard Congregational Church and are almost down to the intersection of  
Center Dr. A little slower than anticipated. They ran into some rock and ledge requiring blasting  
and jackhammers. The design phase for Phase 3 from Ledyard High School to Pennywise Lane  
is underway and will commence after phase 1 is completed. They have to get a contract on that  
as soon as possible because the ARPA funding has to be authorized by Dec. 31st 2024. Phase 2  
from the Ledyard Congregational Church to the Rt. 117/Rt. 214 intersection. The design and  
engineering work for that will follow along with a cost estimate. The CT DOT did not want Rt.  
117 dug up until the state was ready to resurface it. The Town will attempt to convince the state  
to allow that portion of Rt. 117 to be resurfaced so that the sewer project can be completed. 1 to  
1.5 year away. It has to be completed by Dec. 2026 in order to use the ARPA funding. Some  
residents had asked about sewer assessments but there are none on Phase 1 or Phase 3, but there  
will be on the Phase 2 portion if grant dollars isn’t used.  
Town Planner Burdick asked if people along the route will be connected to the sewer. Mayor  
Allyn said the plan is not to have them connect. However, there are a couple of undersized lots  
on the Phase 1 portion that could have issues between water and sewer and separation. So they  
are prepared to allow them to connect if the need arises. Phase 1 $390,000 - budgeted $950,000.  
Vincent asked if Phase 1 will extend to the condominiums at the end of Fairway Dr. Mayor  
Allyn said that the initial plan was to stop at the intersection of Fairway Dr. and Colby Dr. and  
letting the developer on Fairway Dr. and the Habitat for Humanity project on Colby Dr. extend it  
further themselves. However, there may be up to $400,000 left from the $950,000 that had been  
budgeted for Phase 1 budget so they are looking into extending it to the edge of both properties.  
Mayor Allyn shared a page from a book that the Greater Norwich Area Chamber of Commerce  
had published some time ago. It’s being updated so the Ledyard page is being revised by the end  
of July.  
RECEIVED AND FILED  
RESULT:  
Planner’s Report  
B.  
There were three applications on the agenda when she started work.  
·
·
18 lot 8-30g subdivision at 96,98,100 Stoddards Wharf Rd.  
GFI, LLC excavation - She has getting up to speed on this. She expects it to be  
resubmitted sometime in late July or August with a hearing probably in  
September.  
·
·
·
·
59 Kings Hwy mobile manufactured home park - approved at the last meeting  
with several conditions. They have permission to mow and to cut branches and  
chip but can’t disturb soil.  
Then a fourth application came in at the former Dow property to relocate a  
previously approved building away further away from the river and the neighbors’  
property. This was approved.  
A new application was submitted last week that will be received at the Wetlands  
Commision meeting tonight for a 320-unit multi-family development at Sweet  
Hill Farm which was sold recently.  
Rt. 12 corridor study has been revised by Mayor Allyn so that the RFQ and RFP  
are combined into one document. Interested firms will submit their qualifications  
and other information as well as a sealed bid. The selection process will be to  
review the submissions and select the top 3 proposals and then open their sealed  
fee proposal. She requested that the commissioners review it as soon as possible  
so that it can be posted this week in various locations. The document requests that  
submittals be made by August 8th.  
The recently hired admin has left and a new admin has been hired.  
RECEIVED AND FILED  
VII. OLD BUSINESS  
RESULT:  
Corridor Study Update  
A.  
Covered in Planner's Report.  
CONTINUE  
RESULT:  
Business Directory Update  
B.  
Town Planner Burdick will have a link to the Business Directory added to the home page of the  
Town’s website.  
Hary stated that Dreimiller had sent some changes that had been made to the online directory and  
he will be making those changes to PDF version.  
Vincent noted that Human Performance is out of business. A protein drink shop will replace it.  
Also, there’s a new business that just opened up, Tripple M, next to Yoko Loko.  
Twisted Sugar Bake is almost ready to open, just waiting for the building official to sign off.  
Dreimiller noted that Edwards Martial Arts has changed its signed to Gracie Jiu-Jitsu but a sign  
on the door states that they are closed. Town Planner Burdick knows something about this and  
will follow up with Dreimiller.  
Dreimiller also stated that CT Lash has been replaced JY Glow Esthetics, Vanessa Villena, and  
House of Glamour on 2nd floor. A new business next to Triple B named Smaug’s Chamber has  
opened. It is a tattoo parlor and collectibles shop. 2Q Nails Salon has closed and Fancy Nails has  
opened in the same location.  
Dreimiller asked for clarification on three businesses. Do we know anything more about the  
firearms research and development business that was mentioned in a previous meeting, is  
Computech Auto Center is still in business at the corner of Rt. 12 and Long Cove Rd. or is that a  
new business, and has K-Trail moved in at Lorenz Parkway yet. Town Planner Burdick met with  
someone from K-Trail recently and that is moving along and she will get more information on  
the other two businesses.  
Schneider noted that Sew Mindful has closed.  
CONTINUE  
VIII. NEW BUSINESS  
RESULT:  
Development of the FY 2023-2024 EDC Annual Report. Review and update of the  
A.  
FY2022-2023 Annual Report  
Dreimiller noted that Mayor Allyn has already provided his feedback on draft #2. Anyone else  
with feedback should forward it to him.  
Vincent suggested that we remove the Business Directional Signs page as a Future Project.  
Mayor Allyn thought those signs would be a good idea and that we should start defining what’s  
required, such as whether permission from the state is required to locate the signs on sign posts  
that are in the state’s right-of-way.  
Mayor Allyn noted that permission has been approved from the CTDOT for the electronic sign  
in Ledyard Center.  
Vincent mentioned the abundance of sandwich signs located along Rt. 12. Town Planner  
Burdick stated that Joe Larkin used to drive around town on a Friday and pick up signs. She  
noted that the regulations were re-written since she last worked for the Town so she needs to  
review them to see what needs to be enforced. Mayor Allyn stated that we need send the Town’s  
Zoning Enforcement official out to do a sweep.  
CONTINUE  
RESULT:  
IX.  
ADJOURNMENT  
Our next meeting will be on August 6th at 6:42pm in the Town Hall Annex.  
Mr. Hary moved the meeting be adjourned, seconded by Ms. Schneider  
The meeting adjourned at 6:34p.m.  
VOTE: 4-0 Approved and so declared  
Respectively Submitted,  
_______________________________  
Michael Dreimiller, Secretary  
Economic Development Commission  
Dated: July 2, 2024  
DISCLAIMER: Although we try to be timely and accurate these are not official records of the  
Town.