The regular meeting of the Commission is scheduled for Tuesday,
September 20th, 2022, at 7:00 PM, in the Ledyard Senior Center. Please
contact the office immediately if you will not be able to attend.
2. Fields:
All fields have been overseeded, dethatched, and fertilized. With the
recent rain we are seeing the fields bounce back nicely from the drought
we have been in.
3. Erickson Park:
The walking path has been sprayed with weed killer, next step is to till
and possibly bring in stone dust to top off the path. The recent rain
washed out the boat launch. Russell recommended talking to Joe at PW to
see if he might be able to create a swale that would direct the water runoff
to the side of the boat launch preventing a loss of material.
4. Christy Hill:
The parking lot lights have been installed. Everything is installed and we
are just waiting for Eversource to make the connection.
5. Irrigation Issues:
With the recent drought we have identified 2 irrigation issues.
·
·
Judge Crandall: Irrigation heads are too low. Water is hitting the
grass blades and water is not covering the intended area. This is
evident by little green circles surrounded by grass that went
dormant during the drought. Working on getting the irrigation
company out to look and give an estimate.
Depta Field: We have noticed 2 corners of the field are not getting
enough water when there is a slight wind. Mike just spread the
remainder of the topsoil and those heads are scheduled to be raised
and replaced. To resolve this issue, we will extend those 2 zones
adding another head to each corner that would spray back into the
field. This will create an overlap ensuring those corners are
watered.
6. New Preschool Playscape:
The new playscape for the Donahue property is currently at a freight
company in Plainfield. Currently coordinating the offloading and
installation of the equipment. Installation could start as early as next
week! Following the equipment installation, the safety surfacing will be
installed.
7. Playscapes:
We have started a massive playground overhaul. I have started preforming
audits on our playscapes to identify everything needed to bring our
playscapes into compliance.
·
·
I have started marking out the use proper use zones.
With the use zones marked out Russel can then put the playground
borders in the correct location. In addition, he is replacing rotten
sections with new lumber.
·
The next step after the borders are corrected is to bring in new
wood fiber. Currently getting quotes with hopes of starting to get
material to the playscapes as early as next week.
8. Aljen Playscape Vandalism: