filed. Proof of said filing shall be submitted to the Land Use Dept.
2. Four (4) final plan sets, along with a digital copy of the final plan, shall be submitted to
the Land Use Dept. & shall be signed and sealed with original signatures by L.S., P.E. &
C.S.S.
3. The final approved site plan set, following endorsement, shall be filed on the Land
Records in the Office of the Town Clerk within 90-days following its approval, et al. No
zoning permit to start work shall be issued until filed. Proof of said filing shall be submitted
to the Land Use Dept.
4. An approved Zoning Permit is required prior to the start of any work.
5. Prior to issuance of a zoning permit to start work, A Soil Erosion & Sediment Control
bond shall be posted in the amount of $3,500 in a form acceptable to the Finance Director.
No bond, or portion thereof, shall be released without prior approval of the Zoning Officer
and/or Director of Land Use & Planning.
6. Following the issuance of a zoning permit to start work, the Zoning Official and/or Land
Use Director shall be contacted and a pre-construction meeting shall be held at least
one-week prior to start of any work.
7. Following the pre-construction meeting, Soil Erosion & Sediment Controls (SESC) shall
be installed in accordance with the approved plan set and inspected by the Zoning Officer
prior to the start of any work. SESC shall be maintained in good working order until the site
is permanently stabilized with vegetative or other cover.
8. After work has commenced, any substantive changes to the approved site plan require
review and approval by the Land Use Director and/or the Planning & Zoning Commission.
9. Applicant shall meet all of the requirements of the Ledyard Town Engineer, Building
Department, Fire Marshal, WPCA, and Ledge Light Health District for required permitting
and inspections.
10. Prior to issuance of any Certificate of Zoning Compliance, all site improvements shall be
constructed in accordance with the approved site plan. A complete As-Built plan certified to
A-2 accuracy per ZR Sec. shall be submitted to the Zoning Official and/or Land Use Director
for review & approval.
11. The Applicant may, at the discretion of the Zoning Official and/or Land Use Director if
the site improvements have been substantially completed, submit a site completion bond for
any improvements that have not been completed at the time of the request for Certificate of
Zoning Compliance due to weather or other constraints out of the control of the
Applicant/Owner. A bond estimate for said improvements shall be submitted to the Land
Use Dept. for review and approval and any bond shall be posted in a form acceptable to the
Finance Director.
MOVER: Woody