PSR - Steve Banks.
5.
The motor starter for one of the new skid mount sewer pumps burned up because the wiring
came loose during transit from the manufacturer. A replacement starter has been ordered by the
manufacturer. Chairman Lynch said the pump is still operating, although at a reduced rate.
The starter needed to be replaced at the Lakeside pump station.
DISCUSSED
VIII. OLD BUSINESS
RESULT:
Ledyard Center Trail and Sewer Line Project status proceeding to a spring construction start
1.
continued.
The WPCA has received no word on when the multi-modal trail and sewer line extension can
proceed, but Steve Masalin, Public Works Director reported that he believes SECOG has
completed its approval process. DOT has another turn at it from a funding standpoint, after
which it will be ready to bid.
Rules and Regulation review and possible changes continued.
2.
Ms. Wadecki thinks the policy needs to more accurately explain that only sewer can receive
relief, that water charges cannot be adjusted. In extreme cases a water charge may be reviewed
but that is an exception. Chairman Lynch said he will modify the policy and present it the
Authority during the August meeting.
ACTION ITEM:
Update Water/Sewer relief policy.
CONTINUE
RESULT:
Route 12/Baldwin Hill Road hydrant relocation.
3.
Status on recent public hearing held on July 13, 2023.
Chairman Lynch said the well was fracked, he believes it was successful and there is no need to
consider a water main extension for now.
COMPLETED
RESULT:
Cost of Service quote review and discussion.
4.
Ian Stammel, Assistant Finance Director told Chairman Lynch he doesn't believe the WPCA has
money freed up to fund this endeavor. Ms. Wadecki said if the Authority wants to seriously
consider completing the Cost of Service Study then the WPCA needs to know how to fund it.
Mr. Jones said he doesn't believe the funds should come from the Capital account; clarification
is needed from Finance. Chairman Lynch will speak with Mr. Stammel and report his findings
during the August meeting.
ACTION ITEM:
Chairman Lynch will discuss the funding options with Ian Stammel, Assistant Finance Director.