Good Afternoon Robert - please contact Patrick Bateman at Weston and Sampson (I have included him in the above email). The Ledyard WPCA presently defers all inquiries to them as they designed the phase 2 system for the town on Route 117. Also please be advised that this is a Low Pressure sewer system that requires properly sized grinding pumps and not a forced main. I am assuming that this request is for EG Homes which we are currently signing an agreement with them for 7,200 gallons/day. Also, the WPCA encourages you to contract with Weston and Samson design reviews, any contractor inspection and final as-builts as the WPCA will refer to them for final system acceptance. You will need to also coordinate all design and construction activity with Groton Utilities with respect to water systems as the Ledyard WPCA has an existing contract with them for water development activity. Let me know if there is any other question you have and good luck on this project! Ed Lynch, WPCA Mobile 646-732-9224 Good afternoon Mr. Lynch, BL Companies is working on permitting the above-mentioned Project. Current status is that Inland wetlands has accepted an application for the Project and will be conducting a site walk this coming Friday. We will be before the commission in early May. We are looking to coordinate with WPCA for the sewer. The current design is 17 buildings and 72 dwelling units. We are directing sewage flow from those units via gravity to a pump station located on site. Pump station will utilize a duplex grinder pump system. We are looking to coordinate (design and details) the actual connection of that pump station effluent to the Town’s LP 4” force main. I have attached our current site plan and utilities plan for reference. Can you direct us to who we may talk to coordinate this work? Regards, Bob Robert Roles, P.E. Principal Engineer BL Companies | Employee owned. Client driven. 355 Research Parkway, Meriden, CT 06450 tel: 203.630.1406 | direct: 203.608.2469 fax: 203.630.2615 www.blcompanies.com