Budget Discussion - we will be proceeding witht eh public hearing for a water rate increase of 5%. The Weston and Sampson amendment to the original work has been approved to proceed without the need of a waiver - however a new development of going down Gallup Hill from the high school to Pennywise is to be implemented (instead of a separate trail) going on top of the present 2 1/2 inch line which will save significant costs in engineering and constrcution. A new estimate for both engineering and construction will be done ASAP. In addition a discussion was held to re-adjust a rate structure based on meter size.